Click images to enlarge

Glebe Island Bridge 81 – 90

Placing concrete segment on eastern deck – c.1994 Placing concrete segment on eastern deck – c.1994 The gap is closed on the segmented deck – c.1995 The gap is closed on the segmented deck – c.1995 Barney Kreft reaches out to guide a fascia panel rising towards tower head – c.1995 Barney Kreft reaches out to guide a fascia panel rising towards tower head – c.1995 Barney Kreft reaches out to guide a fascia panel rising towards tower head – c.1995 Barney Kreft reaches guides a fascia panel into place – c.1995 Spirit level and reimforcing rods – c.1995 Spirit level and reimforcing rods – c.1995 General view onto western approach span – c.1995 General view onto western approach span – c.1995 Formtraveller is lowered onto barges after completition of western deck segments – c.1995 Formtraveller is lowered onto barges after completition of western deck segments – c.1995 Colour-coded outer stay cable sheaths – c.1995 Colour-coded outer stay cable sheaths – c.1995 Construction graphic – c.1995 Construction graphic – c.1995 Steel detail – c.1995 Steel detail – c.1995 Photographs 61 – 70 Photographs 91 – 100

 

 

© 2008 David Moore Photography Pty Ltd